How soon do you need it?
Borehole Drillers Moreleta Park quote on getting water out of the ground at a house, a smallholding or a farm in the area, priced by contractors who already move a rig through it rather than across the province for a single hole.
- Know what a metre should cost in Moreleta Park before you sign anything.
- One short message, and contractors near you send their rates.
- From LEADERR APPROVED providers, vetted and backed by many verified 5-star reviews. So you can choose with confidence, not guesswork.
Tell us what the water is for, and compare what comes back.
Get the Best QuoteBorehole Drillers Moreleta Park Prices
Typical ranges, so a quotation that sits far outside them is worth questioning.
| Item | Ballpark price |
|---|---|
| Drilling, per metre, domestic hole | R450 - R850 |
| Drilling, per metre, agricultural hole | R550 - R1,200 |
| uPVC casing, per metre installed | R220 - R480 |
| Mobilisation, within a metro | R2,500 - R6,500 |
| Typical 60m domestic hole, drilled and cased | R45,000 - R85,000 |
| Geophysical siting survey, domestic stand | R2,500 - R7,500 |
| Submersible pump, installed, domestic | R18,000 - R48,000 |
| Solar borehole pump system, domestic | R35,000 - R65,000 |
| Wellpoint and surface pump, garden setup | R9,500 - R26,000 |
| Repair callout and diagnosis, metro | R850 - R2,200 |
| Pump pull and refit | R4,500 - R12,000 |
| Rehabilitation of a clogged hole | R15,000 - R45,000 |
| Full SANS 241 water analysis | R2,200 - R5,500 |
| 5,000 litre tank and stand, installed | R9,500 - R22,000 |
Prices JUST UPDATED. Ballpark figures, rounded, excluding VAT. They reflect typical South African borehole drilling, pump and water treatment rates. They are not our prices or quotations, and no provider is bound by them. Drilling is quoted PER METRE and the depth is not known until the hole is down, so confirm what each quotation includes, such as mobilisation, casing, development and what you pay if no water is found.
What Borehole Drillers in Moreleta Park Quote On
- What the water is for. A garden, a house, livestock, irrigation or a business. It sets the yield you need and therefore the depth, the pump and most of the price.
- The rate per metre. The headline figure, and it varies with the ground. Hard rock drills slower than sand and is quoted higher, and some contractors price the two separately.
- The expected depth. An estimate from what other holes nearby went to. Ask what happens to the price if the hole has to go deeper than the estimate, because that is where a quote and an invoice usually part company.
- Casing, per metre. How much of the hole gets lined and in what. A quotation that leaves casing out is not comparable with one that includes it.
- Mobilisation. Getting the rig to the property and off again, charged on distance. This is why a contractor already working in the area usually comes out cheaper.
- Access to the spot. Whether a rig and a water tanker can reach it, how level it is and what has to be moved. The detail most people leave out, and the commonest cause of a revised price.
- A dry hole. What you pay if the hole finds nothing worth pumping. Almost every contractor still charges for the metres drilled, and the terms differ, so ask.
- What is not in the price. The pump, the tank, the electrical connection and the water analysis are often quoted separately. Ask for them on the same page or the cheapest quotation will be the one that includes least.
What the Job Involves
- Siting the hole. Finding where to drill, usually with a geophysical survey rather than a divining rod. It is the cheapest part of the job and the one that decides whether the rest of it finds water.
- Getting the rig in. A truck mounted percussion or rotary rig has to reach the spot and stand level on it. Access is quoted as mobilisation and it is the first thing to talk about if the stand is tight.
- The drilling itself. Charged per metre, and the depth is not known until the hole is down. A quotation gives a rate and an expected range rather than a total anyone can promise.
- Casing and screening. A uPVC or steel liner keeps the hole open and keeps loose ground out of it. Quoted per metre installed, separately from the drilling.
- Developing and blowing clean. Air lifting the hole until it runs clear, which is what turns a hole full of drilling spoil into one a pump can work in.
- The yield test. Pumping the hole for a set period and measuring what it sustains. This is the figure a pump is chosen against, and it is worth having before anyone sells you one.
- The pump and the plumbing. A submersible pump, the rising main, the cable, the control box and the run to a tank or the house. Often a separate quotation from the drilling.
- Water quality. A laboratory analysis against SANS 241 if anyone will drink it. Treatment or filtration is priced on what the analysis finds rather than guessed at.
A quotation against your own ground beats a ballpark every time.
Get the Best QuoteWhat Affects the Price
- How deep the hole goes. Drilling is sold per metre, so depth is the single biggest line on the quotation, and nobody knows it until the hole is down.
- What the ground is. Soft sand, weathered rock and hard dolomite drill at different speeds and are quoted at different rates. Neighbouring holes are the best guide.
- How much casing it needs. A hole through loose ground needs lining most of the way; one through solid rock may need it only at the top.
- What the water is for. A garden pump and an irrigation setup are different machines at different prices, and the yield you need decides which one.
- Getting the rig there. Mobilisation is charged on distance and on how hard the stand is to reach. A contractor covering Moreleta Park prices it differently from one travelling across the province for one hole.
- The pump and the rising main. The deeper the water sits, the bigger the pump and the more cable and pipe it takes. This grows with depth rather than being a fixed extra.
- Power at the property. Mains, three phase or solar. A solar setup costs more up front and nothing a month, which changes the comparison rather than just the figure.
- Testing and treatment. The yield test, the laboratory analysis and any filtration the analysis calls for. Small lines next to the drilling, and the ones most often left off.
What to Include in Your Request
- The address. The suburb and street in Moreleta Park, so a contractor can tell at once whether they work there and what it costs to get the rig in.
- What the water is for. A garden, the house, livestock, crops or a business, and roughly how much you expect to use. This is what the whole quotation is sized against.
- Whether there is a hole already. A new hole, a hole that has stopped giving water and a hole with no pump in it are three different jobs.
- What the neighbours have. How deep nearby holes went and what they give, if you know. It is the best guide anyone has to what yours will cost.
- The stand and the access. Erf size, where you would want the hole, and whether a rig and a water tanker can reach it. Say if there is a narrow gate or a steep drive.
- Power at the spot. Mains, three phase, or whether you want it run on solar. It changes the pump quotation rather than the drilling one.
- Whether you want the pump quoted too. Drilling and equipping are often separate quotations. Ask for both if you want a figure for water at the tap rather than a hole in the ground.
- Whether anyone will drink it. If so, say so, and ask for a SANS 241 analysis and any treatment to be priced with the rest.
Getting the Site Ready
- Ask for the yield test in writing. A figure in litres per hour over a stated pumping period. Without it a pump is being chosen on a guess.
- Check who handles the registration. Abstraction beyond reasonable domestic use needs authorisation from the Department of Water and Sanitation, and some municipalities want the hole registered with them as well. Ask who files it.
- Ask about the water, not just the hole. Borehole water is not drinking water until a laboratory says so against SANS 241. Have the analysis priced with the job.
- Walk the access with them. The rig, a water tanker and a bakkie all have to get in. Five minutes on site settles more than a phone call does.
- Check the quotations describe the same job. The same expected depth, the same casing, the same testing and the same pump, otherwise you are not comparing like with like.
- Ask who makes good afterwards. Drilling brings up spoil and uses a lot of water, and the area around the hole takes a beating. Settle who clears it before the quote is accepted.
- Ask what the per metre rate includes. Drilling alone, or drilling with casing, development and blowing clean. The cheap rate is often the one that includes least.
- Ask what happens if the hole is dry. Most contractors still charge for the metres drilled. The terms differ and they are worth reading before the rig arrives, not after.
Borehole Drillers Moreleta Park FAQs
How much does a borehole in Moreleta Park cost?
It follows the depth, the ground and what the water is for rather than the suburb, with mobilisation added on distance. The table on this page gives typical South African ranges, and the quotations you get back will price your own stand and your own expected depth.
How deep will my hole have to be?
Nobody knows before drilling starts. Contractors estimate from holes nearby and quote a rate per metre with an expected range, which is why a borehole is priced per metre rather than as a total. Ask what the nearest holes went to and what happens to the price beyond the estimate.
What if the hole does not find water?
It happens, and in almost every agreement you still pay for the metres drilled. A siting survey first is the cheapest way to shorten those odds, and the dry hole terms are worth settling in writing before the rig arrives.
Do I need permission for a borehole?
Reasonable domestic use is allowed under Schedule 1 of the National Water Act without a licence, but the hole should be registered with the Department of Water and Sanitation, and abstraction beyond domestic use needs a water use authorisation. Some municipalities require registration with them too, so check with your own council.
Does the contractor have to be local to Moreleta Park?
No, but it usually costs less if they are. Mobilisation is charged on distance, so a contractor already working in the area tends to quote lower, knows what the ground does locally and can get back sooner if something needs attention.
Can I drink the water?
Not until it has been analysed. A laboratory test against SANS 241 says whether it is safe and what, if anything, needs treating. Iron, hardness and bacteria are the usual findings, and filtration is priced on the result rather than fitted on spec.
How long does the work take?
A domestic hole is often drilled in a day or two once the rig is on site, with the pump and plumbing a separate visit. The wait is usually for a slot in the contractor's schedule rather than for the drilling itself, and rigs book up through the dry months.
Borehole drilling in Moreleta Park is one of the jobs contractors listed on Borehole Drillers South Africa quote for, alongside pumps, repairs, testing and water treatment.
Related Services
Get the Best Quote, Fast
Client Reviews
Powered by leaderr

